If you’re residing in Faisalabad and need a FESCO new electricity connection, the process is now easier than ever! By filling out an online application form, you can apply for a new meter connection without leaving the comfort of your home. This guide will walk you through the entire process, from submitting your form to tracking your application status.
How to Apply for a FESCO New Electricity Connection
Step-by-Step Guide to the Online Application Process
Applying for a FESCO new connection involves several steps, but the process is straightforward. Here’s how you can apply:
- Visit the FESCO ENC Portal
Open the Electricity New Connection (ENC) online application portal on your desktop or laptop. - Click “Apply”
On the homepage, locate the “Apply” button and click on it to begin the process. - Provide Neighbor’s Reference Number
Enter your neighbor’s electricity bill reference number. The system will auto-fill other details like the neighbor’s name, address, and the relevant distribution company. - Select Load Type
Choose the appropriate load based on your requirement (e.g., 5 kW for domestic use, more for industrial or commercial connections). - Select Connection Type
Choose from options such as domestic, commercial, agricultural, or industrial based on your needs. - Input Applicant Details
Enter your full name, CNIC number, father’s or husband’s name, address, and contact details. Make sure all information is accurate. - Premises and Load Details
If there’s already an existing meter, mention it. Otherwise, opt for “0.” You’ll also need to provide details about the appliances you’ll be using and the expected electrical load. - Upload Required Documents
Upload scanned copies of necessary documents, including:- FESCO bill of a neighbor
- Property ownership proof
- CNIC (attested copy)
- Wiring contractor’s test report
- Submit the Form
Review the entire form, agree to the terms and conditions, and hit the “Submit” button. Complete the CAPTCHA and submit the application.
How to Check FESCO New Connection Status
After applying, you can track the status of your new connection using the tracking number provided.
- Access the ENC Portal
Head to the ENC portal and click on the “Track” button. - Select Application Type
Choose “New Connection” and select “FESCO” as your distribution company. - Enter Tracking Number
Enter the tracking number you received and hit “Submit” to view your application status.
FESCO Demand Notice
Once your application is reviewed, FESCO will issue a demand notice. This includes all necessary charges for installing your new connection, such as service line length and equipment.
How to Download the FESCO Demand Notice
- Visit ENC Portal
Navigate to the portal and select the “Print” button. - Enter Tracking Number
Choose “New Connection” and input your tracking number. - Download Demand Notice
The demand notice will appear. You can download or print it for payment.
How to Submit Demand Notice Online
Once you’ve paid the demand notice fee, submit the payment proof online.
- Upload Payment Proof
On the ENC portal, upload the scanned copy of your paid demand notice voucher. - Submit Form
Submit the form and wait for FESCO to proceed with the installation, which will typically take 15 days.
FESCO New Connection Fees
FESCO’s demand notice fees depend on the type of connection (single-phase or three-phase) and whether the location is rural or urban.
Connection Type | Description | Charges |
---|---|---|
Single Phase (Rural) | Up to 40 meters | Rs. 4,000 |
Single Phase (Urban) | Up to 40 meters | Rs. 4,000 |
Three Phase (Both) | Up to 40 meters | Rs. 15,000 |
Service Line Extension | Per additional meter | Variable |
FAQs
It typically takes 15 days after the submission of the demand notice.
You will need:
Neighbor’s FESCO bill
Property ownership proof
CNIC (attested copy)
CNIC copy of a witness
Wiring contractor’s test report
Use the tracking number provided at the time of application submission and check the status on the FESCO ENC portal.
Fees vary based on factors like connection type (single-phase or three-phase) and location (rural or urban). The minimum charge for a single-phase connection is Rs. 4,000.
You can apply for a FESCO new electricity connection online through the Electricity New Connection (ENC) portal. Simply fill out the application form, provide necessary details (like neighbor’s reference number), upload required documents, and submit the form. Once submitted, your application will be processed, and you can track the status online.
To check and download your FESCO demand notice, follow these steps:
Visit the ENC portal.
Click on the “Print” button on the left side.
Enter your new connection tracking number and select the “Submit” button.
You will see an option to download or print your demand notice.
To apply for a new electricity meter in Pakistan, visit the respective distribution company’s online portal (such as FESCO for Faisalabad). Fill out the online application form, upload the required documents (property ownership proof, CNIC copy, etc.), and submit the application. The process is handled online, and you can track the progress via a tracking number provided after submission.
The cost for an electric meter demand notice in Pakistan varies based on the type of connection and location. For single-phase connections, the charges start at Rs. 4,000 for service line lengths up to 40 meters in both rural and urban areas. Additional charges may apply for longer service lines or three-phase connections.
You can track your FESCO new connection application status by visiting the ENC portal. Enter the tracking number you received during the application submission, choose “New Connection” as the application type, and select “FESCO” as your distribution company. The current status of your application will be displayed.
To check the status of your new electricity meter connection:
Visit the ENC portal.
Click the “Track” button.
Select “New Connection” and enter your tracking number.
The current status will be displayed on the screen.
o track the progress of your FESCO demand notice:
Visit the FESCO ENC portal.
Select the “Track” button on the webpage.
Enter your tracking number and choose “Demand Notice” as the application type.
The status of your demand notice will be shown.
The FESCO Demand Notice is a document issued after reviewing your new connection application. It lists the charges required to install the new meter, including service line length and other necessary equipment. Once paid, the meter installation process proceeds.
You can apply for a FESCO new connection online through the ENC portal. Complete the application form, provide necessary details (neighbor’s reference number, load requirement, personal information), upload documents (CNIC, property proof), and submit the form. You can track the application status online using the tracking number.
You can download the FESCO new connection application form from the official FESCO ENC portal or fill it out online during the application process.
To print your FESCO demand notice:
Visit the ENC portal.
Select the “Print” option.
Enter your tracking number and choose to download or print the notice from the options provided.
Your FESCO application number is provided upon successfully submitting your new connection application through the ENC portal. This number allows you to track the status of your application and access your demand notice online.