FESCO New Connection: Complete Guide to Online Application

If you’re residing in Faisalabad and need a FESCO new electricity connection, the process is now easier than ever! By filling out an online application form, you can apply for a new meter connection without leaving the comfort of your home. This guide will walk you through the entire process, from submitting your form to tracking your application status.

How to Apply for a FESCO New Electricity Connection

Step-by-Step Guide to the Online Application Process

Applying for a FESCO new connection involves several steps, but the process is straightforward. Here’s how you can apply:

  1. Visit the FESCO ENC Portal
    Open the Electricity New Connection (ENC) online application portal on your desktop or laptop.
  2. Click “Apply”
    On the homepage, locate the “Apply” button and click on it to begin the process.
  3. Provide Neighbor’s Reference Number
    Enter your neighbor’s electricity bill reference number. The system will auto-fill other details like the neighbor’s name, address, and the relevant distribution company.
  4. Select Load Type
    Choose the appropriate load based on your requirement (e.g., 5 kW for domestic use, more for industrial or commercial connections).
  5. Select Connection Type
    Choose from options such as domestic, commercial, agricultural, or industrial based on your needs.
  6. Input Applicant Details
    Enter your full name, CNIC number, father’s or husband’s name, address, and contact details. Make sure all information is accurate.
  7. Premises and Load Details
    If there’s already an existing meter, mention it. Otherwise, opt for “0.” You’ll also need to provide details about the appliances you’ll be using and the expected electrical load.
  8. Upload Required Documents
    Upload scanned copies of necessary documents, including:
    • FESCO bill of a neighbor
    • Property ownership proof
    • CNIC (attested copy)
    • Wiring contractor’s test report
  9. Submit the Form
    Review the entire form, agree to the terms and conditions, and hit the “Submit” button. Complete the CAPTCHA and submit the application.

How to Check FESCO New Connection Status

After applying, you can track the status of your new connection using the tracking number provided.

  1. Access the ENC Portal
    Head to the ENC portal and click on the “Track” button.
  2. Select Application Type
    Choose “New Connection” and select “FESCO” as your distribution company.
  3. Enter Tracking Number
    Enter the tracking number you received and hit “Submit” to view your application status.

FESCO Demand Notice

Once your application is reviewed, FESCO will issue a demand notice. This includes all necessary charges for installing your new connection, such as service line length and equipment.

How to Download the FESCO Demand Notice

  1. Visit ENC Portal
    Navigate to the portal and select the “Print” button.
  2. Enter Tracking Number
    Choose “New Connection” and input your tracking number.
  3. Download Demand Notice
    The demand notice will appear. You can download or print it for payment.

How to Submit Demand Notice Online

Once you’ve paid the demand notice fee, submit the payment proof online.

  1. Upload Payment Proof
    On the ENC portal, upload the scanned copy of your paid demand notice voucher.
  2. Submit Form
    Submit the form and wait for FESCO to proceed with the installation, which will typically take 15 days.

FESCO New Connection Fees

FESCO’s demand notice fees depend on the type of connection (single-phase or three-phase) and whether the location is rural or urban.

Connection TypeDescriptionCharges
Single Phase (Rural)Up to 40 metersRs. 4,000
Single Phase (Urban)Up to 40 metersRs. 4,000
Three Phase (Both)Up to 40 metersRs. 15,000
Service Line ExtensionPer additional meterVariable

FAQs

1. How long does it take to process a FESCO new connection?

It typically takes 15 days after the submission of the demand notice.

2. What documents are required for a new connection?

You will need:
Neighbor’s FESCO bill
Property ownership proof
CNIC (attested copy)
CNIC copy of a witness
Wiring contractor’s test report

3. How can I track my FESCO new connection application?

Use the tracking number provided at the time of application submission and check the status on the FESCO ENC portal.

4. What are the fees for a new FESCO connection?

Fees vary based on factors like connection type (single-phase or three-phase) and location (rural or urban). The minimum charge for a single-phase connection is Rs. 4,000.

How to apply for FESCO new connection?

You can apply for a FESCO new electricity connection online through the Electricity New Connection (ENC) portal. Simply fill out the application form, provide necessary details (like neighbor’s reference number), upload required documents, and submit the form. Once submitted, your application will be processed, and you can track the status online.

How do I check my FESCO demand notice?

To check and download your FESCO demand notice, follow these steps:
Visit the ENC portal.
Click on the “Print” button on the left side.
Enter your new connection tracking number and select the “Submit” button.
You will see an option to download or print your demand notice.

How to apply for an electricity meter in Pakistan?

To apply for a new electricity meter in Pakistan, visit the respective distribution company’s online portal (such as FESCO for Faisalabad). Fill out the online application form, upload the required documents (property ownership proof, CNIC copy, etc.), and submit the application. The process is handled online, and you can track the progress via a tracking number provided after submission.

What is the cost of an electric meter demand notice in Pakistan?

The cost for an electric meter demand notice in Pakistan varies based on the type of connection and location. For single-phase connections, the charges start at Rs. 4,000 for service line lengths up to 40 meters in both rural and urban areas. Additional charges may apply for longer service lines or three-phase connections.

How do I track my FESCO new connection?

You can track your FESCO new connection application status by visiting the ENC portal. Enter the tracking number you received during the application submission, choose “New Connection” as the application type, and select “FESCO” as your distribution company. The current status of your application will be displayed.

How to check new meter connection status online?

To check the status of your new electricity meter connection:
Visit the ENC portal.
Click the “Track” button.
Select “New Connection” and enter your tracking number.
The current status will be displayed on the screen.

How do I track my FESCO demand notice?

o track the progress of your FESCO demand notice:
Visit the FESCO ENC portal.
Select the “Track” button on the webpage.
Enter your tracking number and choose “Demand Notice” as the application type.
The status of your demand notice will be shown.

What is FESCO New Connection demand notice?

The FESCO Demand Notice is a document issued after reviewing your new connection application. It lists the charges required to install the new meter, including service line length and other necessary equipment. Once paid, the meter installation process proceeds.

How do I apply for FESCO New Connection online?

You can apply for a FESCO new connection online through the ENC portal. Complete the application form, provide necessary details (neighbor’s reference number, load requirement, personal information), upload documents (CNIC, property proof), and submit the form. You can track the application status online using the tracking number.

Where can I get the FESCO new connection application form?

You can download the FESCO new connection application form from the official FESCO ENC portal or fill it out online during the application process.

How do I print my FESCO demand notice?

To print your FESCO demand notice:
Visit the ENC portal.
Select the “Print” option.
Enter your tracking number and choose to download or print the notice from the options provided.

How do I get my FESCO application number?

Your FESCO application number is provided upon successfully submitting your new connection application through the ENC portal. This number allows you to track the status of your application and access your demand notice online.